Legacy data platform modernization without breaking what depends on it
Nobody schedules a data migration because it sounds like fun. A support deadline, a cost review, or a report that now takes all night forces the question. And the true drill is changing the platform while the systems, reports, and business processes that depend on it keep working.
Azati modernizes and migrates the warehouses, databases, and ETL environments behind enterprise reporting, analytics, and AI. We map dependencies before recommending a path, then tune, rebuild, or migrate in controlled phases, validating outputs throughout the transition.
On a learning platform with over one million registered learners and no allowance for downtime, Azati carried out multi-step migrations on live tables and billion-record backfills as part of a continuous engineering engagement.
Records migrated and backfilled on live tables for a 24/7 learning platform, over more than five years of continuous engineering work
3 hours to 10–15 minutes
A financial extract optimized in an existing Oracle environment, without replacing the platform
2 databases to 1
PostgreSQL and Oracle consolidated into a single source of truth, with integrity checks during migration
90 TB data lake
A Db2 Warehouse migration planned around the analytical applications that depended on the platform in a US media environment
Key takeaways
Most migration risk sits in what depends on the platform, not in the data itself. Dependency mapping comes before any move.
A smaller intervention is often enough. One financial extract that ran for hours was fixed in place and now runs in 10 to 15 minutes.
Live systems can be migrated in steps. Azati ran multi-step migrations on live tables and billion-record backfills for a platform that could not go offline.
Validation is production work, not a final checkbox. We check outputs throughout the transition, so reports keep matching.
Modernization is not always migration. Rebuilding the transformation logic or tuning the platform in place can unblock more than a new platform.
What is legacy data platform modernization?
Legacy data platform modernization updates the databases, data warehouses, and ETL environments that support an organization's reporting, analytics, and operational data needs. The goal is to make the platform easier to maintain, more reliable, and better suited to current workloads.
Modernization does not always mean migration. Depending on the problem, it can involve optimizing the existing platform, rebuilding fragile ETL and transformation logic, migrating selected workloads in phases, or replacing the platform entirely.
The right approach depends on what the platform supports, which systems depend on it, and whether its current architecture can meet the organization's performance, cost, security, and support requirements.
What are the options for modernizing a legacy data warehouse?
There are three common approaches: fix the existing platform, migrate workloads in phases, or replace the platform. They solve different problems and carry different levels of cost, effort, and migration risk.
Azati starts by identifying the actual constraint and the systems that depend on it. We recommend the smallest approach that addresses the problem, and consider a full replacement only when the existing architecture cannot meet the requirements.
Three approaches to modernizing a legacy data warehouse, with what each means, when it fits, and its main risk
Approach
What it means
Usually the right choice when
Main risk
Fix in place
Tune queries, statistics, ETL logic, or refresh patterns on the existing platform
The bottleneck is isolated, and the architecture still fits current needs
Postpones a platform decision you will eventually have to make
Phased migration
Move workloads and data in stages, validating each stage while dependent reports keep running
The platform limits growth, cost, or support, but reporting can't stop
Takes longer than a cutover and needs close dependency tracking
Full replacement
Build a new platform and retire the old one
The architecture can no longer support required scale, latency, or security
Highest cost and the largest chance of breaking downstream reporting
Why do data platform migrations go wrong?
Most migration risk sits in what depends on the platform, not in the data itself.
01
Hidden dependencies
A warehouse may feed more consumers than anyone has documented: reports, models, exports, finance files, and applications. Without a dependency map, a change to the platform can have unexpected effects downstream.
02
Reports that must still match
Business users rely on established numbers. If a migration changes report outputs, the difference needs to be identified and explained before users switch to the new environment.
03
No convenient downtime window
Some data platforms support business processes around the clock. Migration sequencing must account for the applications and workloads that depend on the platform, rather than assume a quiet weekend is available.
04
Treating migration as a one-time project
Validation, performance tuning, and data-quality checks continue after cutover. They are part of operating the modernized platform, not tasks that end when the data has moved.
What does Azati do?
Map the dependencies first
We inventory data sources, jobs, schedules, applications, and downstream reports before proposing a modernization path. This helps identify critical dependencies, undocumented flows, and the order in which workloads can be changed.
Business outcome: migration risks and affected consumers are identified earlier, giving the team a more informed plan.
Migrate in controlled phases
Data and workloads move in stages, with outputs checked before the next phase begins. Migration order is based on dependencies, business criticality, and the ability to validate each workload independently.
Business outcome: the organization can change the platform in manageable steps instead of relying on one high-risk cutover.
Migrate live systems with minimal disruption
Where the architecture permits, we use multi-step migration approaches for live tables, ETL between data sources, and large historical backfills. Load testing and performance validation take place before production changes.
Business outcome: critical systems can be modernized while reducing the need for disruptive maintenance windows. Downtime requirements are assessed for each environment.
Rebuild the logic, not just the platform
Sometimes the main problem is what the ETL jobs do rather than where they run. We rebuild fragile transformation logic, simplify dependencies, and improve orchestration where necessary, without assuming the entire data platform must be replaced.
Business outcome: modernized workloads are easier to understand, maintain, and extend.
Validate throughout the transition
We compare migrated outputs against agreed reference results and perform integrity checks when data is moved or databases are consolidated. Where business rules or results legitimately change, the differences are documented and agreed before consumers switch.
Business outcome: reporting teams have evidence that the migrated data is consistent with the agreed requirements.
Tune and stabilize after cutover
Once the modernized environment carries real workloads, we review query plans, statistics, memory use, and refresh patterns. On one Oracle-based financial extract, optimized statistics and query execution reduced runtime from three hours to 10–15 minutes and reduced direct path read events by 50%.
Business outcome: the platform delivers measurable performance improvements under the workloads it was built to support.
Add capacity where your platform is stuck
Whether you need an assessment, two engineers inside your team, or a defined migration workstream, start with a conversation. Describe the platform and what is forcing the decision. We respond within one business day, with an NDA on request before the first call.
Assess the platform before choosing a migration path
A migration plan is only as reliable as its understanding of the existing environment. Before recommending a platform change, Azati can assess the systems, workloads, and dependencies that shape the migration plan.
A scoped assessment can include:
Platform inventory: databases, warehouses, ETL tools, orchestration, and infrastructure.
Dependency mapping: source systems, jobs, schedules, downstream reports, applications, and data consumers.
Workload review: data volumes, load patterns, processing windows, query performance, and growth trends.
Data validation requirements: critical outputs, integrity rules, reconciliation needs, and historical data requirements.
Modernization options: fixes in place, selective workload migration, phased platform migration, or full replacement.
The outcome is a prioritized view of risks, dependencies, and modernization options, with recommended next steps and a delivery scope that can be estimated.
The scope and duration of the assessment depend on the size and complexity of the data estate. Azati's fixed 3-week AI data readiness assessment is a separate option for organizations evaluating data suitability for a defined AI use case.
How do you migrate a data platform while reports keep running?
Migration sequencing, validation depth, and downtime requirements depend on the source and target architecture, data volumes, and downstream dependencies.
01
Assess the environment
Map databases, sources, ETL jobs, consumers, and failure history. Identify the reports and business outputs that must remain consistent.
02
Plan the migration phases
Prioritize workloads based on dependencies, criticality, and migration risk. Agree validation criteria, release windows, and rollback options before moving data.
03
Migrate and validate
Move each workload in stages. Compare outputs against agreed reference results and load-test in a performance environment where required.
04
Cut over and stabilize
Switch consumers when the relevant validation criteria are met. Monitor the new environment under real workloads and tune performance where necessary.
05
Hand over or continue support
Provide documentation and transfer operational knowledge to the client's team, or continue with embedded engineering and production support under an agreed engagement model.
Choose the level of support your migration requires
Assessment first
Technical assessment and roadmap
Understand the current data estate, map dependencies, identify risks, and compare modernization options before committing to a migration.
Suitable when: you know the platform needs attention but have not established whether to optimize, migrate, or replace it.
Defined scope
Defined migration or modernization workstream
Assign Azati a specific scope, such as a database consolidation, ETL modernization, warehouse migration, or performance improvement initiative. Deliverables, validation criteria, and responsibilities are agreed before implementation.
Suitable when: you have a defined platform change and need an engineering team to deliver it.
Embedded team
Embedded data engineering team
Add Azati engineers to your existing data team to work on your repositories, standards, release process, and migration backlog.
Suitable when: your organization owns the architecture and platform but needs additional capacity or continuity through a long-running modernization.
Ongoing support
Post-migration engineering support
Continue with agreed monitoring, troubleshooting, performance tuning, and maintenance after cutover. Support coverage and response expectations are defined for each engagement.
Suitable when: your internal team needs ongoing engineering capacity to operate and extend the modernized platform.
What does this look like in production?
Sports & Entertainment
How to turn high-volume streaming and broadcast data into better content and advertising
100 monthsLong-term media data engineering partnership
300+ETL processes supporting media data workflows
90 TBData lake across a hybrid analytical environment
IBM DB2 Warehouse
Netezza
Microsoft SQL Server
SQL
PL/SQL
Python
Node.js
Business challenge
A large US media company needed to connect streaming, broadcast, advertising, promotion, and audience data to operational decisions. Its hybrid environment included 300+ ETL processes, approximately 90 TB of data lake storage, and 30 TB of application data, making reliable data processing, historical modeling, and infrastructure evolution increasingly complex.
Solution at a glance
Azati provided long-term media data engineering support across the client's data platform and analytical applications. The work covered ETL orchestration, data quality, historical modeling, database performance, analytics, and DB2 Warehouse migration while keeping interconnected media workflows operational as requirements and infrastructure evolved.
How Azati solved the challenge
Streaming analytics and content performance: Built and maintained analytical capabilities that helped teams evaluate streaming performance, audience behavior, content placement, and premiere timing.
Advertising analytics and optimization: Engineered data and application capabilities for targeted advertising, campaign planning, audience analysis, and performance optimization. The client reported a 17% increase in advertising revenue during the relevant period at comparable advertising-time volume.
Broadcast scheduling and content placement: Developed data-driven capabilities for schedule construction, content placement, potential-viewership forecasting, and comparison of planned versus expected results.
Targeted promotion: Supported targeted promotional campaigns across the client's television channels by applying audience and performance data to campaign planning and optimization.
Cross-platform campaign analytics: Built analytical capabilities for evaluating digital advertising campaigns across television and streaming properties, supporting cross-platform performance measurement and reporting.
Media data warehousing and ETL: Engineered and maintained more than 300 ETL processes across a hybrid environment containing approximately 90 TB of data lake storage and 30 TB of application data. The work included data transformation, analytical data marts, historical processing, SCD Type 1–3 modeling, and data-quality controls.
Data infrastructure migration: Supported the migration of IBM DB2 Warehouse from Gen2 to Gen3, developing custom data-transfer and validation mechanisms with Prefect and SSIS. The team also performed database and PL/SQL optimization for high-volume analytical workloads.
Business outcomes
One data foundation for multiple media decisions: The broader data environment supported streaming analytics, broadcast scheduling, content placement, audience targeting, promotional planning, and digital campaign analysis.
300+ ETL processes maintained across evolving requirements: Long-term engineering support kept interconnected data workflows operational as data sources, schemas, applications, and analytical requirements changed.
Historical context preserved for media analytics: SCD strategies, historical models, and analytical data marts helped preserve the context required to compare audience, content, and campaign states over time.
17% client-reported advertising revenue increase: The targeted advertising application supported campaign planning, audience analysis, and performance optimization. The client reported a 17% increase in advertising revenue during the relevant period, while advertising-time volume remained comparable. The available information does not isolate Azati's contribution from other commercial factors.
Analytical infrastructure evolved without starting over: Custom migration and validation mechanisms supported the DB2 Warehouse Gen2-to-Gen3 transition while existing analytical dependencies remained part of the modernization effort.
How to scale a global EdTech platform without disrupting learning
1M+Registered learners across global markets
75K+Active teachers managing classes across multiple countries
1B+Database records processed and maintained without downtime
Ruby on Rails
React
JavaScript
PostgreSQL
Redis
AWS
Docker
Sidekiq
Webpack
CloudFront
Business challenge
A digital learning platform serving schools, universities, language centers, and corporate training programs across the US, Asia, Latin America, and Europe needed to scale its capabilities without compromising the availability of active learning environments.
The platform operates 24/7 across time zones, supports a growing database with millions of new records every week, and integrates with external Learning Management Systems (LMS). Its engineering team had to deliver new assignments, assessments, teacher tools, and integrations while maintaining stable APIs, reliable releases, and uninterrupted access for students and teachers.
Azati joined the client's engineering team as a backend specialist and has contributed continuously for over five years, supporting platform development, production operations, and large-scale data engineering.
Solution at a glance
Backend and learning workflows: Development of assignment, assessment, gradebook, and student progress functionality.
LMS integration: LTI connectivity, SSO, grade passback, and enrollment synchronization with Canvas, Moodle, Blackboard, and other platforms.
High-volume data engineering: Multi-step schema migrations, ETL pipelines, and historical data backfills designed for live production environments.
Embedded engineering: Long-term participation in the client's development process, from backlog refinement and implementation to QA and production support.
How Azati solved the challenge
Develop assignment and assessment workflows at scale: Azati contributed to the platform's core learning functionality, including assignment creation and distribution, submission tracking, automated grading, teacher review workflows, test banks, and Online Placement Tests.
Grading operations run asynchronously through Sidekiq and SQS, keeping processing-intensive tasks separate from the main application flow. The work also covered gradebook functionality and student progress reporting, supporting different learning formats and classroom scenarios.
Connect the platform to institutional LMS environments: Institutional customers often need digital learning content to work within their existing education infrastructure. Azati implemented and maintained integrations with Canvas, Moodle, Blackboard, and other LMS platforms using Learning Tools Interoperability (LTI).
The integration layer supports launch flows, single sign-on, grade passback, content linking, and enrollment synchronization through OneRoster. API compatibility across web and mobile clients was maintained as the platform evolved.
Migrate billion-record datasets without taking the platform offline: Database changes on a platform with billions of records require careful sequencing to avoid locking tables or degrading live queries.
Azati implemented multi-step migration patterns: introducing new columns alongside existing ones, backfilling records in batches, switching application logic, and cleaning up legacy structures after migration. ETL pipelines and retroactive historical data updates were also part of the work.
Before production changes, migrations were tested in a dedicated PERF environment containing an obfuscated copy of production data. Apache JMeter load testing helped assess their performance under representative conditions.
Improve observability and production incident response: The distributed service architecture relies on multiple internal services and external integrations. Azati contributed to centralized structured logging, request and trace ID propagation, monitoring, and incident analysis to help identify issues across service boundaries.
When incidents occurred, the work included telemetry analysis using New Relic and Sentry, root-cause investigation, hotfix deployment, incident reporting, and retrospectives. Findings informed subsequent release controls and reliability improvements.
Maintain teacher-facing analytics and learning tools: Azati also contributed to teacher workflows spanning assignments, grading, gradebooks, and student progress analytics.
The platform supports multiple course series and CEFR levels, with interactive digital textbooks, audio and video materials, and mobile learning. Gradebook and analytics functionality provides teachers with per-student and per-assignment performance views, progress tracking, and manual grading and score overrides.
Deliver new functionality alongside ongoing reliability work: Feature development continued while the platform served active classes around the clock. Azati participated in backlog refinement, technical scoping, sprint planning, code review, multi-environment QA, release coordination, and post-release monitoring.
The engineer also supported customer success teams handling technical issues raised by schools and universities, connecting product development with the operational needs of institutional users.
Business outcomes
A global learning platform serving over one million registered learners: During the five-year engagement, the platform grew to serve 1M+ registered learners and 75K+ active teachers across multiple international markets.
Database evolution without planned downtime: Multi-step migration practices and pre-release performance testing enabled structural changes and historical data backfills across billion-record datasets without taking the platform offline.
Broader LMS interoperability: Integrations with Canvas, Moodle, Blackboard, and other platforms support institutional workflows, including SSO, grade passback, and enrollment synchronization.
More controlled production releases: Multi-environment QA, go/no-go reporting, load testing, post-release monitoring, and incident retrospectives became part of the engineering and release process.
Long-term EdTech engineering knowledge retained: The continuous engagement built practical expertise in LMS and LTI integrations, educational data, blended learning workflows, and the operational requirements of a global learning platform.
Security and operational context
The platform operates under ISO/IEC 27001:2022 and SOC 2 Type II certifications. Its infrastructure is monitored 24/7 by a dedicated support partner, and quarterly penetration testing is conducted to validate its security posture.
How to reduce Oracle general ledger extract time from 3 hours to 10–15 minutes
3 hours to 10–15 minutesGeneral ledger extract runtime
50% reductionDirect path read events
OLTP + DSSStatistics collection balanced across transactional and batch workloads
Oracle
Oracle SQL Trace
Business challenge
A US leader in patient safety, healthcare insurance, claims, and risk solutions faced severe performance issues when extracting large volumes of financial data from its general ledger.
Inefficient SQL execution, invalid system statistics, and memory pressure caused extract jobs to run for hours, slowing financial reporting, analytics, and operational workflows. The database supported both online transaction processing (OLTP) and decision support system (DSS) workloads, making performance tuning more complex: statistics optimized for one processing pattern could negatively affect the other.
The objective was to identify the root causes of slow extraction, improve query execution plans, and establish a statistics collection strategy that reflected actual database behavior under different workload conditions.
Solution at a glance
Performance diagnostics: Oracle SQL Trace analysis to identify slow queries, inefficient execution paths, and full table scans.
Root cause identification: Investigation of invalid or non-representative system statistics and ineffective index utilization.
Statistics optimization: Collection and validation of daytime, nighttime, and 24-hour statistics.
Workload balancing: Statistics strategy accounting for both OLTP and DSS processing conditions.
Execution plan optimization: Publishing validated statistics to help the Oracle optimizer select more efficient query plans.
How Azati solved the challenge
Identify inefficient query execution paths: Azati used Oracle SQL Trace and performance monitoring to investigate slow operations and identify queries responsible for extract delays. The analysis focused on execution plans, full table scans, memory pressure, and I/O bottlenecks.
This provided a basis for distinguishing query-level inefficiencies from problems caused by database statistics and workload conditions.
Trace performance issues to system statistics: The investigation identified a class of queries that consistently triggered full table scans because the available system statistics were invalid or did not adequately represent actual performance conditions.
As a result, the optimizer selected suboptimal execution plans instead of making effective use of available indexes. Identifying this underlying issue helped focus optimization on the factors influencing query planning.
Collect representative statistics across different workloads: Because the database handled both transactional OLTP activity and batch-oriented DSS processing, a single statistics profile could not adequately represent all operating conditions.
Azati gathered and validated statistics across three time windows: daytime, nighttime, and a full 24-hour period. This made it possible to account for changing workload patterns and avoid optimizing the database for only one processing scenario.
Validate and publish optimized statistics: The collected statistics were analyzed before being published. The objective was to provide the Oracle optimizer with more representative information about system behavior, improve execution plan selection, and reduce unnecessary full table scans.
This statistics-focused approach addressed the root cause of inefficient query execution rather than relying solely on query-level changes.
Improve extraction performance and reduce database load: Following the optimization, general ledger extract runtime fell from three hours to 10–15 minutes. Direct path read events also decreased by 50%, indicating a reduction in this category of database I/O activity.
Together, these improvements accelerated financial data extraction and reduced the processing burden associated with the workload.
Business outcomes
General ledger extraction completed in 10–15 minutes: Runtime was reduced from three hours, making financial data available sooner for reporting, analytics, and operational workflows.
50% fewer direct path read events: Reduced direct path read activity lowered I/O pressure associated with the extraction workload.
More representative database statistics: Time-based statistics collection accounted for daytime, nighttime, and full-day workload conditions across OLTP and DSS processing.
More efficient query execution: Publishing validated statistics helped the optimizer select improved execution plans and reduced unnecessary full table scans.
Improved efficiency for financial data processing: The optimized extraction process reduced delays in downstream reporting and operational activities involving general ledger data.
1 integrated systemPhysician and patient record modules
Java
Spring
Hibernate
ZK
PostgreSQL
Oracle
MySQL
SQL
JasperReports
Business challenge
A healthcare company maintained two separate solutions for its Physician and Patient Records modules, each backed by a different database technology: PostgreSQL and Oracle. Managing these systems independently increased maintenance complexity and made cross-module integration more difficult.
The company needed to bring both databases into a unified structure while adapting the application's internal Java logic, improving the user interface, and introducing a recruitment module for medical assessments.
The work also involved practical delivery constraints: a distributed team working remotely across a distance of more than 5,500 kilometers, infrastructure performance issues, and evolving requirements that required close clarification and coordination.
Solution at a glance
Database unification: Merging PostgreSQL and Oracle databases into a single structure for physician and patient records.
Java application logic: Reworking internal logic to support the verified patient role and consistent operation across modules.
User interface enhancement: Developing custom tables to display medical conclusions for recruits despite ZK Framework limitations.
Medical reporting: Integrating JasperReports for PDF generation of medical forms, including Form 088.
Recruitment workflows: Developing a module to manage medical examinations, health assessments, and reporting for military recruits.
Infrastructure and delivery: Moving the application to a private cloud, relocating databases closer to the development team, and establishing structured remote collaboration.
How Azati solved the challenge
Consolidate physician and patient databases: The Physician and Patient Records modules relied on separate PostgreSQL and Oracle databases. Azati merged them into a unified structure, bringing the two data domains together and simplifying how the application accessed and managed records.
The consolidation established a common data foundation for both modules and reduced the complexity of maintaining separate database environments.
Adapt Java logic for different user roles: Database consolidation also required changes to the application's internal logic. Azati rewrote significant parts of the Java code to introduce a verified patient role in the Physician Module.
This enabled the system to support different user types while maintaining consistent operation across the integrated modules.
Extend the user interface beyond framework limitations: The existing ZK Framework imposed limitations on the presentation of complex medical data. In particular, the recruitment workflow required tables capable of displaying medical conclusions with both vertical and horizontal scaling.
Azati developed custom web interface components to support these data views, improving access to medical information for the users working with recruitment records.
Automate medical documentation and reporting: Azati integrated JasperReports to generate PDF forms, including Form 088, using medical data from the system.
The reporting functionality supported more consistent document generation and digital storage and retrieval of medical records, reducing reliance on manual preparation.
Develop a dedicated recruitment module: Azati built a module for tracking military recruits' health and suitability for service. It brought examination data, health assessments, and reporting into a structured workflow for medical and administrative staff.
The module was integrated with the main patient database, connecting recruitment-related medical information with the wider record system.
Resolve infrastructure and distributed delivery constraints: Remote collaboration across more than 5,500 kilometers introduced infrastructure challenges, including slow server response and delays associated with automated testing and server restarts.
Azati moved the application to a private cloud and relocated databases closer to the development team to improve response times and reduce workflow delays.
The team also used Redmine for task management, with daily discussions and bi-weekly meetings to clarify requirements, coordinate changes, and maintain delivery progress.
Business outcomes
Unified physician and patient data management: Merging the PostgreSQL and Oracle databases brought both modules into a single structure, reducing the complexity of maintaining separate data environments.
Improved application operation: Database consolidation and Java logic optimization helped improve system performance and reduce operational friction.
More accessible medical information: Custom UI components made it possible to display medical conclusions in the recruitment workflow despite the limitations of the existing framework.
More consistent medical documentation: JasperReports integration enabled PDF generation for critical medical forms, including Form 088.
Streamlined recruitment assessments: The new module connected examination data, health assessments, and reporting with the main patient database, supporting medical and administrative workflows.
Not sure whether you need a migration, a fix, or a rebuild?
A slow warehouse, an unsupported database, or a fragile ETL process does not automatically mean the entire platform needs replacing. Tell us what you're running, what depends on it, and what is forcing the decision. Azati can help assess the constraints, identify the smallest effective change, and outline a practical next step before a larger migration is proposed. We respond within one business day. An NDA can be arranged before the first call.
You're facing a platform that is costly to maintain, nearing the end of vendor support, or blocking AI and analytics plans.
Heads of data engineering and platform leads
You need to migrate or modernize while the team still runs the platform every day.
Heads of BI and reporting
Your numbers depend on a warehouse nobody wants to touch.
Enterprises running mixed estates
You're running IBM Db2 Warehouse, Netezza, Oracle, SQL Server and SSIS, or Hadoop alongside newer tools, where one platform replacement isn't realistic.
How is Azati's approach different?
Dependencies before platforms
We map the jobs, reports, applications, and consumers that depend on a data platform before recommending a migration path.
Smallest change first
We assess whether performance tuning, ETL restructuring, or selective migration can solve the problem before proposing a full replacement.
Validation throughout the transition
Data integrity and report outputs are checked at each agreed stage, not left until final cutover.
Embedded engineering and continuity
Azati engineers can work within your team and continue supporting the platform after release, under an agreed engagement model.
Migration planned around business constraints
Workload criticality, downtime tolerance, reporting deadlines, and rollback options shape the migration sequence.
What technologies does Azati use in data platform modernization?
Listed technologies come from delivered projects. We choose the target platform that fits your estate, and cloud warehouse targets are assessed case by case.
Technologies Azati has used in delivered data platform modernization projects, by area
Area
Technologies used in delivered projects
Warehouses and databases
IBM Db2 Warehouse, Netezza, Oracle, Microsoft SQL Server, PostgreSQL, MySQL, Hadoop (HDFS, Hive)
ETL and orchestration
Microsoft SSIS, Prefect, dbt, Apache Airflow, Apache NiFi, Python, PL/SQL
Cloud and runtime
AWS (S3, EC2, RDS), IBM Object Storage, Kubernetes, Docker
Quality and change control
Great Expectations, Flyway
How does Azati handle security and access during a migration?
Migration work can run inside client-controlled environments and follow the client's access policies. Access roles and responsibilities are agreed before work begins, including the permissions required for development, deployment, and support.
Security and access
For regulated environments, Azati can help document technical controls, data lineage, access arrangements, and processing records within the agreed project scope. This documentation can support internal governance and third-party risk reviews related to frameworks such as GDPR and DORA. The client's own policies, controls, and compliance responsibilities remain part of the overall environment.
Frequently asked questions
Start by identifying what is no longer working. If the issue is an isolated query, inefficient ETL job or refresh pattern, optimizing the existing platform may be enough. If the architecture cannot meet current requirements for scale, performance, cost, security, or support, a phased migration or replacement may be justified. Azati maps dependencies and assesses the constraints before recommending an approach.
A scoped assessment can cover the existing databases and warehouse, ETL jobs, data sources, downstream reports and applications, data volumes, performance constraints, validation requirements and downtime tolerance. The outcome is a dependency view, migration risks, modernization options, and recommended next steps. The exact scope depends on the size and complexity of the environment.
Yes. Modernization does not require a cloud migration. It can involve tuning an existing on-premises warehouse, rebuilding ETL logic, consolidating databases, or improving orchestration. Cloud migration is considered when it addresses a specific requirement such as supportability, scale, cost, or infrastructure constraints.
Some database migrations can be performed with little or no downtime using approaches such as replication, staged migration, and controlled cutover. Whether this is feasible depends on the source and target technologies, transaction volumes, application dependencies, and acceptable consistency window. Azati assesses these constraints before proposing a migration approach and does not assume that every environment can be migrated without downtime.
Existing jobs and reports are inventoried as part of dependency mapping. Each workload is assessed to determine whether it should be retained, migrated, rebuilt, or retired. Reports with critical business outputs are assigned validation criteria so that results can be compared before consumers switch to the modernized environment.
Azati can continue with agreed engineering support after cutover, including troubleshooting, performance tuning, maintenance, and work on new data requirements. Support coverage, responsibilities, escalation paths, and response expectations are defined for each engagement. This is not an automatic 24/7 service or a standard SLA unless those terms are explicitly agreed.
Cost depends on the platform, data volumes, number of dependent jobs and reports, target architecture, validation requirements, and migration constraints. A focused performance improvement or ETL rebuild may be considerably smaller than a full platform migration. Azati assesses the existing environment and recommends a scope based on the actual problem rather than assuming a full replacement.
Legacy data platform modernization updates the warehouses, databases, and ETL environments behind an organization's reporting and analytics so they remain supportable, affordable, and ready for new workloads such as AI. It can mean tuning a platform in place, migrating it in phases, or replacing it. Azati starts with the smallest change that solves the problem and validates outputs throughout.
Data migration moves data and workloads from one system to another. Data platform modernization is broader: it can include migration, but also rebuilding transformation logic, improving orchestration, and tuning performance on the existing platform. Many problems that look like migration needs are solved by modernizing in place, which is why Azati assesses dependencies before recommending a move.
By validating outputs throughout the transition, not only at the end. That includes integrity checks when databases are merged or moved, comparing results that business reports depend on, and load-testing in a performance environment before production where volumes require it. Where results legitimately change, the change is explained before consumers switch.
It depends on data volumes, the number of jobs and consumers, how well the current platform is documented, and how much reporting can pause. A single database consolidation can be scoped quickly, while a large estate is phased over months or longer. Azati's three-week AI data readiness assessment produces the dependency view that sets a realistic timeline.
Not always. Targeted fixes to integration, quality rules, and governance often unblock more AI work than a platform replacement. Where a legacy platform genuinely blocks AI, such as unreliable loads or inconsistent history, modernizing it in phases is the safer route. The AI data readiness assessment shows which situation you are in.
Yes. Azati's data engineers work inside client-led teams, on your repositories, standards, and processes. At a chemical manufacturer, embedded engineers extended and modernized an analytical platform for more than 24 months, and on the learning platform above, the same Azati engineer has contributed for over five years. Continuity is part of how we reduce migration risk.
Last updated
Tell us which data platform is holding your team back
What's next?
1. Tell Us Your Story
Describe your project. We come back within one business day with team availability and a rough plan. NDA on request before the first call.
2. Get Your Roadmap
Receive a detailed proposal with scope, team
composition, timeline, and costs tailored to your goals.
3. Start Building
Azati aligns on details, finalize terms, and launch your
project with full transparency.